Industry

Real estate and urban development

Developers and city agencies need sites that work on paper, pass certification and stay comfortable in a hotter climate. We combine design, environmental performance and data so the scheme that goes to the board has already been tested.

Photo: Scotts Valley from the air. CriticalAngleOfAttack, CC0, via Wikimedia Commons.

Questions we answer

What clients in this sector bring us

  1. What can this site carry, and in which form?
  2. Will the design meet EDGE, LEED or BREEAM, and at what cost?
  3. How will streets, squares and roofs cope with heat and heavy rain?
  4. What do lenders need to see on environmental and social risk?

Services

Where engagements usually start

  • Architecture

    Site feasibility and concept design

    Site analysis, capacity study, bioclimatic strategy, two concept options and a cost range.

    You receive
    Feasibility report, concept drawings, area schedule
    Typical duration
    4–6 weeks
  • Architecture

    Green-building certification support

    Gap analysis, design optimisation and evidence package for EDGE, LEED or BREEAM.

    You receive
    Gap analysis, energy and water model, certification file
    Typical duration
    6–10 weeks
  • Architecture

    Masterplan

    Vision, land-use and mobility plan, phasing, public space and green infrastructure.

    You receive
    Masterplan report, plans, 3D views, phasing plan
    Typical duration
    12–20 weeks
  • Environment

    ESIA scoping study

    Screening, scoping, legal review and a terms of reference for the full ESIA.

    You receive
    Scoping report, ESIA terms of reference
    Typical duration
    3–5 weeks

Start a project

Bring us the question

Tell us about the site, the programme or the decision ahead. A few sentences are enough to start.

Describe your project